null

Emergency Repair/Response

VALUE:

$477,990.00

CLIENT:

City of Miami Beach

DELIVERY METHOD:

Emergency Work

TYPE:

Emergency Repair, Force Main Pipeline, Bypass Pumping, Paving Shoring

Description

Emergency Repair of existing 54″ PCCP Force Main hit by a directional driller on Miami Beach. RMCF’s on call response allowed for a safe and successful replacement of the broken 54″ main. The repair also included Extensive dewatering, trench shoring, bypass pumping, 20″ plug valve install, 20″ linestop install, and FDOT restoration.