
VALUE:
$477,990.00
CLIENT:
City of Miami Beach
DELIVERY METHOD:
Emergency Work
TYPE:
Emergency Repair, Force Main Pipeline, Bypass Pumping, Paving Shoring
Description
Emergency Repair of existing 54″ PCCP Force Main hit by a directional driller on Miami Beach. RMCF’s on call response allowed for a safe and successful replacement of the broken 54″ main. The repair also included Extensive dewatering, trench shoring, bypass pumping, 20″ plug valve install, 20″ linestop install, and FDOT restoration.
