Replacement/ Rehabilitation of 72″ Sanitary Sewer Force Main
null

Trenchless Technologies

VALUE:

$16,746,672.00

CLIENT:

Miami Dade Water & Sewer

DELIVERY METHOD:

Design Build

TYPE:

Slipline, Rehabilitation, Sewer Pipeline

AWARDS:

Design Build Institute of America awarded Ric-Man Construction Florida, Inc Florida, Inc. and Wade Trim the Honor Award for Water/Wastewater for the project.

Description

A Design Build Project for the replacement/rehabilitation of 72-inch Sanitary Sewer Force Main. The catastrophic failure of this force main caused a serious health risk and environmental hazard, and the project was expedited to address the public health and safety issues. The existing force main was located under streets in a heavily populated, single-family residential area. Rehabilitation of 72″ pre-stressed concrete cylinder pipe force main by means of slip lining with approximately 17,000 LF of 63″ HDPE liner. 48 air release valves and 3 72″ plug valves. 8″ Forcemain installation.